The connection process varies depending on the size of the project. Most private customers have a sized system of 20 kW or less, in which case customers must first submit a prepayment with a non-refundable fee of $300. The customer must then complete the online connection request signed by the customer requesting a link, as well as a $100 non-refundable processing fee, including a one-line electrical diagram and insurance certification, which has three levels of production facilities for net measurement contracts. Level 1 inverters inverters-based inverters up to 25kW. Levels 2 and 3 are non-changing projects over 25 kW. Most private customers have Tier 1 systems. Net meter credits are established at Rider RE, Retail Energy Rate, which recovers energy supply costs. Duke Energy`s net measurement program allows customers who generate electricity from their own solar system to offset their energy costs. Participants in the net measure receive a bill credit from Duke Energy for the excess energy generated by their solar panel system. For private clients, the interconnection process for projects is less than or equal to 20kW. Customers must first file a pre-registration with a non-refundable tax of $500. The customer must then complete the online connection request, including a one-line electrical diagram and insurance certification, as well as a $100 non-refundable processing fee.

Duke Energy then issues conditional approval for the installation of the solar installation at the same time as the necessary circuit breaker. Interconnection is the process of physically connecting an electricity generation unit (renewable energy source) to Duke Energy`s electrical system. Each state within Duke Energy`s territory requires an application to establish a link. Registration fees and requirements vary by state. Duke Energy is offering discounts to Customers in North Carolina who want to install a solar installation. For homeowners, the program offers a $0.60/Watt discount for installations up to 10 kilowatts. The profit is 3,600 USD for a system of 6 kilowatts (kW). Non-residential customers also have access to discounts ranging from $0.50/Watt to $0.75/Watt.

In some states, Duke Energy also offers programs that allow its customers to support renewable energy in another way: if installing a customer`s solar panels produces more energy than it consumes in a month, the customer receives net meter credits over a 12-month period. Customers can request a written refund of the rider RE rated utility. After installation, a copy of the inspection and the “Completion Certificate” form must be sent to Duke Energy so that the customer can obtain permission to operate the system as soon as the meter has been set. Duke Energy must receive a full connection request by October 1 to ensure that the project is completed by December 31 of the current year. Any excess energy production at the end of the billing month is credited with the customer`s energy consumption for the next billing cycle. At the end of each calendar year, Duke Energy writes to the customer all unused net meter credits at an annual rate based on the COG-1 rate. If a customer`s solar panel installation produces more energy than that provided by Duke Energy, the customer will be credited with excess kWh during the billing period next month. All accumulated credits are reset each year on May 31 and cannot be used to offset basic investment or application costs. Customers are separately responsible for the monthly basic equipment costs.

Comments are closed.